# Close-outs

Save a draft, submit the outcome of finished work and arrange authorised corrections.

Close-out records what happened after work ends. Ending or cancelling work and submitting its
close-out are separate actions: a saved draft is not a submitted report.

## Who can complete one

Close-out uses **update work activities** permission. Head Office and Project Supervisors can complete
it; Subcontractor Supervisors can complete their own company's close-outs. Users cannot submit.
After submission, only Head Office or a Project Supervisor can correct it.

## Complete the close-out

1. Open the finished activity, or find it in **Close-outs**, and choose **Start Close-Out**.
   If a draft exists, choose **Resume Close-Out** instead.
2. Record the outcome and whether the work was completed. For Example Project's cable installation,
   report what Example Electrical actually achieved across Loading Dock and Plant Room.
3. Follow **Next** through the questions shown. Depending on the outcome, these cover delay reasons,
   lost time and causes, zone fit, other activities affecting the job, access, resources, materials
   and safety events. Answer the follow-ups rather than adding everything only to a general comment.
4. If you need to check details with the crew, select **Save Draft**. Reopen with **Resume Close-Out**
   to continue from the saved answers. Do not rely on leaving the page to save changes.
5. Review the answers and choose **Submit Close-Out**. Correct any validation message, including
   required explanations for Other answers, then submit again.
6. Look for **Close-Out Submitted** and confirm the activity is no longer awaiting submission.

Submitting does not restart work or reserve zones. The outcome answers inform
[metrics](/run-a-project/metrics/), so record an incomplete or delayed outcome honestly rather than
choosing a clean result to finish the form sooner.

## Correct a late End record

If ToolboxFM recorded a final extension, close-out shows the allocated start, allocated finish and
when the extension ended. Times use the project's timezone. A shared date is shown when all three
times fall on the same day; otherwise each marker includes its date.

Answer **Did the work finish on time or go into extension?**:

- **Finished on time**: choose this if the work finished within the latest allocated window but
  somebody recorded End late. You do not need an exact finish time.
- **Went into extension**: keep the recorded overrun, or enter **Actual finish (optional)** if work
  finished late but before End was recorded. Use project time.

The correction affects extension metrics only when you submit, not when you save a draft. It applies
only to the final extension; earlier extensions are kept. ToolboxFM retains the original End record
and an audit trail of corrections. If no final extension was recorded, this question is not shown.

## Correct a submitted answer

1. If you are a Subcontractor Supervisor, ask Head Office or the Project Supervisor for a correction;
   you cannot submit a second version yourself.
2. As an authorised reviewer, open the submitted close-out and select **Edit Close-Out**.
3. Correct the answers and choose **Save Changes**, then check the updated report.

The original submitter and submission time are retained. The first filing and later corrections
appear separately in the [Project Diary](/run-a-project/project-diary/), with an audit trail of changes.

## If you cannot proceed

Check that you opened the correct activity and company and that work has ended. If another person
has already submitted, refresh before trying again. Missing required answers can be kept in a draft
while you obtain the facts; submission needs the answers for the branch you followed.
For access restrictions, contact Head Office and see [Trial and upgrading](/getting-started/trial-and-upgrading/).