# Operational metrics

Review construction work performance across your portfolio or current project and export operational metrics.

## Who can use metrics

**Head Office** can open **ToolboxFM › Metrics** and download reports for their organisation.
Project Supervisor, Subcontractor Supervisor and User do not have access to this page or its export.

Choose **Portfolio** for your organisation's projects or **Current project** for the selected project.
The download follows that reporting scope.

## Answer a reporting question

1. Open **Metrics** as Head Office. Choose **Portfolio** to compare projects, or select Example Project
   and choose **Current project** to investigate its work.
2. Read each card's period and unit before comparing values. Current-state totals and historical
   trends answer different questions; the main activity trend charts cover 12 weeks.
3. Use activity counts and approval/completion rates to ask whether requests are progressing. A rate
   is not a measure of physical construction progress or a promise that every job finished on time.
4. Use exclusion hours, zone usage and subcontractor load to identify concentrations of booked work.
   These are time/count measures, not labour hours, cost or a measurement of site productivity.
5. Compare pause and extension patterns with close-out answers. Before interpreting delay or safety
   distributions, check submitted close-outs against the total: unsubmitted work is not represented
   by those answer distributions. Missing answers are not evidence that no problem occurred.
6. Open the relevant activity or [diary](/run-a-project/project-diary/) to understand the context before
   drawing conclusions about Example Electrical or a busy zone.

QR views count successful requests to public pages, not identified people, unique visitors or proof
that a crew entered a zone. Forecasts project the recorded history; they are not scheduled commitments.
Sparse or empty charts may reflect limited reporting or missing data, not zero risk or zero work.

## Download and compare consistently

1. Confirm Portfolio or Current project and the selected project before choosing **Download CSV**.
2. Open the file in your reporting tool and keep its context rows with the data.
3. Group by section, period and metric, preserving units. Do not add percentages to hours or combine
   the snapshot with historical totals as if they were separate work.
4. When a chart and export differ, first compare the periods: the main trend charts use 12 weeks,
   while the download uses 30 days. Then check scope and the date basis below.

## What the export contains

Use **Download CSV** to save an aggregate report for analysis outside ToolboxFM. It includes:

- A current snapshot of activity counts, exclusion hours, average duration and impacted areas.
- Weekly activity counts, approval and completion rates, and approved exclusion hours over the last 30 days.
- Approved exclusion hours and activity counts by project and day.
- Zone usage and subcontractor load, with rankings capped at five items each.
- Extension counts, open extensions, total extension hours and average extension hours.
- Close-out coverage and answer counts for lost time, zone fit, delay reasons, delay causes and safety events.
- High-risk work answer counts, work-type counts and dropped-objects answers of No.
- Pause and extension totals, daily hours, and the five most recent interventions with activity and project details.
- Public QR page views by day and the five most-viewed zone pages.
- Four weekly forecast projections with lower and upper bounds, calculated from the exported history.

The CSV header is `section,period_start,item,metric,value,unit`.
Rows identify the section, period start where applicable, item, metric, value and unit. Values are
hours, counts or percentages, not costs. Context rows include names and reporting-window details.
Text that starts with a spreadsheet formula character is prefixed with an apostrophe so it stays text.
The current snapshot covers records across all dates in their current state; it is not a 30-day
total or a history of daily snapshots. Historical activity metrics use activities starting in the
last 30 days, excluding future bookings. Close-out metrics use close-out creation dates, while
pause and extension metrics use their start dates. QR views cover the last 30 calendar days,
including today, in each project's timezone.

Extension counts and hours use submitted [close-out finish corrections](/run-a-project/close-outs/#correct-a-late-end-record).
A final extension corrected to **Finished on time** is excluded; an optional actual late finish
shortens its duration. Draft answers do not change these figures. Earlier extensions and the
original End record remain in the audit history.

The page's main trend charts still show 12 weeks; the download uses 30 days. Weekly buckets can
start before the reporting window, but contain only activity starts within it. Forecast rows are
projections, not recorded work, and need at least two weekly buckets of history.

This is a metrics report with a recent-intervention list, not a full download of individual
activities, diary notes, audit records or photos. Enterprise Data Export is a separate product.

## Use the diary for context

Metrics show patterns; the [project diary](/run-a-project/project-diary/) gives the dated work
events and manual site notes behind a day. Close-out corrections retain an audit trail rather
than silently replacing the history.

## Related

- [Work activities](/run-a-project/work-activities/)
- [Project diary](/run-a-project/project-diary/)
- [Roles and permissions](/reference/roles-and-permissions/)